To complete the installation of your Fastlane, follow the nine steps below: |
| Step 1: Position the Fastlane in desired location and install deck mounting plate to pool rails. |  |
 | Step 2: Lower the Fastlane into pool at desired location rolling Fastlane down the pool wall. |
| Step 3: Adjust the Fastlane using a level. |  |
 | Step 4: Mark pool deck for later drilling of centre hole using deck mounting plate as a template. |
| Step 5: Remove the Fastlane from the pool and detach mounting plate for attachment to the pool deck. |  |
 | Step 6: Drill three holes, install anchors, and secure the mounting plate to the pool deck. |
| Step 7: Lower the Fastlane into pool and onto the deck mounting plate. |  |
 | Step 8: Connect hydraulic hoses from the power unit to the Fastlane. |
| Step 9: Cover hose connections with escutcheon. |  |